Senate District 15
Jim Beall San Jose
Over half of all state and local roads are rated in poor condition, require safety improvements and fail to meet earthquake safety standards. The Road Repair and Accountability Act makes sure both state and local agencies have the resources they need to ensure our CA roads and bridges are up to safety standards.
See how this legislation will improve transportation and create tens of thousands of jobs in California with detailed information about annual allocations and projects slated to happen right here in our community.
Local Government Funding
Information on how much money our local governments will receive annually as part of new funding package.
Upcoming Projects
The State and regional transportation agencies will now be able to complete projects that were halted in 2016 due to inadequate funding.
Major Congestion Relief Funding Opportunities
Millions of additional dollars will be spent to create better solutions for congested corridors, trade corridors, self help counties.
Senate District 15: Additional projects slated to be funded Download the PDF | View Postmile Tool
County | Route | Category | Project Description | Begin Postmile | End Postmile | Estimated Cost ($M) |
---|---|---|---|---|---|---|
Santa Clara | 9 | Pavement | Roadway preservation (CAPM) Route 35 to 6th St. Saratoga | 0 | 7 | $0.00 |
Santa Clara | 9 | Pavement | Launched soilnail wall, drainage | 5 | 5.3 | $1.93 |
Santa Clara | 87 | Pavement | Injection grouting | 0 | 0 | $1.18 |
Santa Clara | 87 | Pavement | Roadway rehabilitation (2R) from Rte. 85 to West Julian St. Undercrossing and inject grouting to repair profile | 0 | 6.1 | $69.40 |
Santa Clara | 101 | Pavement | Roadway rehabilitation (2R) from San Benito County Line to Dunn Avenue | 0 | 16 | $100.90 |
Santa Clara | 101 | Bridge | Br No 37-0352H N&S101-N280&N680 Connector | 34.87 | 34.87 | $63.48 |
Santa Clara | 680 | Mobility | Upgrade RM Controller and Replace "METER ON" Ped- Head Signs. | Var | Var | $12.09 |
Santa Clara | 9 17 | Bridge | Br No 37-0144 Saratoga Ave Separation (9/17), Br No 37- 0117 Main Street Overcrossing | 11.43 | 11.43 | $1.83 |
Santa Clara | Various | Mobility | Restoration of Non-Operational Vehicle Detection Devices | Various | Various | $6.25 |