Senate District 13
Jerry Hill San Mateo
Over half of all state and local roads are rated in poor condition, require safety improvements and fail to meet earthquake safety standards. The Road Repair and Accountability Act makes sure both state and local agencies have the resources they need to ensure our CA roads and bridges are up to safety standards.
See how this legislation will improve transportation and create tens of thousands of jobs in California with detailed information about annual allocations and projects slated to happen right here in our community.
Local Government Funding
Information on how much money our local governments will receive annually as part of new funding package.
Upcoming Projects
The State and regional transportation agencies will now be able to complete projects that were halted in 2016 due to inadequate funding.
Major Congestion Relief Funding Opportunities
Millions of additional dollars will be spent to create better solutions for congested corridors, trade corridors, self help counties.
Senate District 13: Additional projects slated to be funded Download the PDF | View Postmile Tool
County | Route | Category | Project Description | Begin Postmile | End Postmile | Estimated Cost ($M) |
---|---|---|---|---|---|---|
San Mateo | 1 | Bridge | Replace the barrier rail with delamination and repair spalls- Pescadero Cr. 35-0028 | 14 | 14 | $8.10 |
San Mateo | 1 | Pavement | secant wall | 18.6 | 18.6 | $3.14 |
San Mateo | 1 | Mobility | SM-1 Travel Time - Install bluetooth readers and Varible Message Signs between I-280 to s/o Half Moon Bay. Modify Advanced Traffic Management Systems. | 26 | 47.8 | $8.45 |
San Mateo | 1 | Mobility | Install Travel Time Elements along SM 1 (travel time readers and VMSs, integrate into Advanced Traffic Management Systems and Traffic Operating Systems Elements along corridor) | 26 | 47.8 | $1.32 |
San Mateo | 1 | Bridge | Br No 35-0170 Sharp Park Road Overcrossing , Br No 35- 0187 Paloma Aveue Overcrossing , Br No 35-0025 Manor Drive Overcrossing | R 43.46 | R 43.46 | $1.60 |
San Mateo | 1 | Pavement | Devil's Slide Tunnel - Br. 35-0330 L/R | R39.0 | R39.9 | $3.70 |
San Mateo | 82 | Pavement | St Francis Way in San Carlos to 43rd Ave in San Mateo | 5.3 | 8.6 | $8.00 |
San Mateo | 82 | Pavement | Roadway rehabilitation (3R) | 12.3 | 15.8 | $24.30 |
San Mateo | 82 | Pavement | Arroyo Drive to Route 280 | 20.8 | 25.2 | $14.00 |
San Mateo | 84 | Pavement | Pavement preservation (CAPM) from Route 280 to Route 101 | 21 | 25 | $13.56 |
San Mateo | 92 | Pavement | Rte 280 to Rte 101 | 7.3 | 12 | $12.00 |
San Mateo | 101 | Bridge | Bridge Rail Replacement/upgrade | 0.1 | 23.4 | $11.13 |
San Mateo | 101 | Bridge | Replace bridge at Cordilleras Creek #35-0019 | 7.13 | 7.13 | $48.50 |
San Mateo | 101 | Mobility | Upgrade Ramp Meter Controller and Replace "METER ON" Ped-Head Signs. | Var | Var | $2.43 |
San Mateo | 109 | Pavement | Notre Dame Ave to junction Route 84 | 1.1 | 1.8 | $1.69 |
San Mateo | 114 | Pavement | Rote 101 to Route 84 | 5 | 5.9 | $2.25 |
San Mateo | 280 | Bridge | Seismic restoration-Alpine Road Undercrossing-35- 0009L/R; Sand Hill Road (South & North)-35-0008 & 35- 0007; Route 280/380 Separation-35-217 | 0.01 | 20.97 | $10.69 |
San Mateo | 1 84 | Bridge | Sub-structure rehab/scour mitigation | 28.92 7.55 | 28.92 7.55 | $4.83 |
San Mateo | 101 82 114 | Bridge | Br No 35-0198 Hillsdale Blvd Overcrossing , Br No 35- 0113 University Ave Overcrossing (South), Br No 35- 0155 University Ave Overcrossing (North), Br No 35- 0096 Broadway Overcrossing | 9.35 | 9.35 | $6.21 |
San Mateo | 82 114 | Bridge | Br No 35-0198 Hillsdale Blvd Overcrossing , Br No 35- 0084 Willow Road Separation | 9.35 | 9.35 | $1.33 |
San Mateo San Francisco San Francisco San Francisco | 1 101 101 101 | Bridge | Baluster bridge rail replacement | R44.21 2.0 2.2 2.84 | R44.21 2.0 2.2 2.84 | $13.30 |
San Mateo Solano | var | Mobility | Modify signal/ install signal | var | var | $1.30 |
Santa Clara | 82 | Pavement | Pavement preservation (CAPM) Route 237 to San Mateo County Line | 19.2 | 26.4 | $28.18 |
Santa Clara | 101 | Pavement | Guadalupe River to San Mateo County Line | 40.2 | 52.6 | $55.00 |
Santa Clara | 101 | Mobility | Upgrade/Repair Ramp Meter location | 50.5 | 52.5 | $2.11 |
Santa Clara | 101 | Bridge | Br No 37-0006R Sargent Bridge & Overhead, Br No 37- 0105 Moffett Blvd Overcrossing, 37-0146 San Antonio Road Overcrossing | R 0.81 | R 0.81 | $4.55 |
Santa Clara | 680 | Mobility | Upgrade RM Controller and Replace "METER ON" Ped- Head Signs. | Var | Var | $12.09 |
Santa Clara | Various | Mobility | Restoration of Non-Operational Vehicle Detection Devices | Various | Various | $6.25 |
Various | Various | Mobility | Restoration of Non-Operational Vehicle Detection Devices | Various | Various | $9.51 |