Senate District 16
Over half of all state and local roads are rated in poor condition, require safety improvements and fail to meet earthquake safety standards. The Road Repair and Accountability Act makes sure both state and local agencies have the resources they need to ensure our CA roads and bridges are up to safety standards.
See how this legislation will improve transportation and create tens of thousands of jobs in California with detailed information about annual allocations and projects slated to happen right here in our community.
Local Government Funding
Information on how much money our local governments will receive annually as part of new funding package.
Upcoming Projects
The State and regional transportation agencies will now be able to complete projects that were halted in 2016 due to inadequate funding.
Senate District 16: Additional projects slated to be funded Download the PDF | View Postmile Tool
County | Route | Category | Project Description | Begin Postmile | End Postmile | Estimated Cost ($M) |
---|---|---|---|---|---|---|
Fresno, Kern | VAR | Mobility | Install Changeable Message Signs | VAR | VAR | $3.50 |
Kern | 5 | Pavement | Drainage System Restoration | 4.1 | 5.89 | $2.50 |
Kern | 5 | Drainage | Replace, reline Culverts | 5.97 | 9.6 | $3.20 |
Kern | 5 | Drainage | Replace, reline Culverts | 8.7 | 9.78 | $15.15 |
Kern | 5 | Drainage | Replace, reline Culverts | 9.72 | 9.75 | $3.05 |
Kern | 5 | Drainage | Replace, reline Culverts | 9.75 | 9.78 | $3.05 |
Kern | 5 | Pavement | Drainage System Restoration | 9.78 | 9.8 | $3.05 |
Kern | 5 | Pavement | Drainage System Restoration | 9.8 | 9.85 | $3.05 |
Kern | 5 | Pavement | Drainage System Restoration | 9.9 | 10.5 | $1.00 |
Kern | 5 | Pavement | Pavement Preservation | 10.2 | 15.9 | $8.10 |
Kern | 14 | Pavement | Pavement Preservation | 0 | 14.5 | $8.90 |
Kern | 14 | Pavement | Mojave Rosamond Rehab | 0 | 14.5 | $8.90 |
Kern | 14 | Pavement | Mojave Pavement Rehabilitation | 15.8 | 17.6 | $3.90 |
Kern | 14 | Pavement | Freeman III Pavement Rehabilitation | 46.2 | 53 | $3.90 |
Kern | 58 | Pavement | Tehachapi Rehab | 90.5 | 100 | $24.70 |
Kern | 119 | Pavement | Pavement Rehabilitation (3R) | 28.3 | 31.28 | $8.00 |
Kern | 155 | Bridge | Seismic Retrofit | 69.9 | 70.2 | $3.00 |
Kern | 166 | Pavement | Pavement Rehabilitation (3R) | 0 | 9 | $12.50 |
Kern | 184 | Pavement | Pavement Rehabilitation (3R) | 0.8 | 8.3 | $13.30 |
Kern | 184 | Pavement | Pavement Preservation | 8.3 | 12.13 | $12.05 |
Kern | 202 | Mobility | Tucker Valley Intersection | 8.85 | R8.9 | $3.00 |
Kern | 204 | Pavement | Pavement Preservation | 5.1 | 6.7 | $5.24 |
Kern | 33 | Pavement | Pavement Preservation | 34.2 | 60.1 | $11.30 |
Kern | 5 | Pavement | Pavement Rehab (2R) | 10.2 | 15.8 | $23.00 |
Kern | 58 | Pavement | Pavement Rehab (2R) | 64.4 | 67 | $6.10 |
Kern Fresno | 119 198 | Drainage | Replace, reline Culverts | 29 13.5 | 30.5 18.2 | $1.20 |
Kern Kings | 99 198 204 | Drainage | Replace Obsolete Pumps | Various | Various | $11.32 |
Madera Fresno Tulare | 99 | Drainage | Replace Obsolete Pumps | Various | Various | $11.30 |
Tulare | 63 | Pavement | Pavement Preservation | 0 | 5.8 | $12.00 |
Tulare | 99 | Pavement | Pavement Rehab (2R) | 27.6 | 30.6 | $6.00 |
Tulare | 190 | Drainage | Replace Reline Culverts | 34.7 | 39.4 | $5.03 |
Tulare | 245 | Bridge | Upgrade Rail | 1.39 | 4.19 | $20.91 |
VAR | Various | Mobility | Vehicle Detection System Repair | Various | Various | $2.40 |
VAR | Various | Mobility | Vehicle Detection System Repair | Various | Various | $1.25 |
Various | Various | Mobility | Vehicle Detection System Repair | Various | Various | $6.56 |
Los Angeles | 5 | Bridge | In LA and Kern Counties on LA-5 between Los Feliz Bl. Overcrossing and LA/Kern Co. line (PM 24.2/R88.6) and on Ker-5 between LA/Kern Co. Line and Route 5/99 Separation (PM 0.0/15.82) - Bridges Rehabilitation and Replacement. | 24.2 | R88.6 | $500.00 |
Los Angeles | 5 | Bridge | Tejon Pass Overcrossing 53 1779 Seismic Retrofit | 87.37 | 87.37 | $3.25 |
Riverside/ San Bernardino | VAR | Mobility | REPLACE DEGRADED CLOSED CIRCUIT TELEVISION WITH DIGITAL CAMERAS | VAR | VAR | $4.48 |
Riverside, San Bernardino | 10, 40 | Bridge | Scour Mitigation Needs | VAR | VAR | $2.51 |
San Bernardino | 15 | Pavement | Pavement Preservation | 75.3 | 123.9 | $58.30 |
San Bernardino | 15 | Pavement | GRIND AND OVERLAY PAVEMENT | 75.3 | 186.2 | $58.30 |
San Bernardino | 15 | Pavement | Grind and Overlay | 75.3 | R124.2 | $46.70 |
San Bernardino | 15 | Pavement | Grind and Overlay | R136.9 | R186.2 | $46.60 |
San Bernardino | 15 | Bridge | Deck / Superstructure preventative Maint. | VAR | VAR | $1.70 |
San Bernardino | 18 | Drainage | Repair & replace culverts | 44.3 | 68 | $5.70 |
San Bernardino | 18 | Pavement | Rehab Drainage | TBD | TBD | $4.80 |
San Bernardino | 18 | Pavement | Reconstruct Slope | VAR | VAR | $4.72 |
San Bernardino | 40 | Mobility | Newberry WIM | 28.9 | 28.9 | $1.50 |
San Bernardino | 40 | Bridge | Essex Rd Overcrossing SUBSTRUCTURE AND SUPERSTRUCTURE WORK AND ACCESS OPENINGS | 99.3 | 0 | $1.30 |
San Bernardino | 40 | Bridge | Bridge Scour Mitigation: Foundation rehab/replacement NEAR NEEDLES AT HALFWAY HILLS WASH (BR #54- 0799L/R) | 101.3 | 101.3 | $13.40 |
San Bernardino | 40 | Bridge | Arbol Ditch -FOUNDATION REHAB/REPLACEMENT | R129.78 | R129.78 | $12.01 |
San Bernardino | 40 | Bridge | CALIFORNIA/ARIZONA STATE LINE AT COLORADO RIVER BRIDGE (BR #54-0415) | R153.9 | R154.64 | $102.00 |
San Bernardino | 40 | Mobility | Weigh In Motion Scale | TBD | TBD | $0.60 |
San Bernardino | 40 | Bridge | FOUNDATION REHAB/REPLACEMENT - 4 locations/bridges | VAR | VAR | $7.01 |
San Bernardino | 58 | Pavement | ROADWAY REHABILITATION (ADDITIONAL FUNDING FOR EA 34770) | 8.2 | 12.9 | $0.00 |
San Bernardino | 95 | Pavement | Pavement Preservation | 64.5 | 80.5 | $9.60 |
San Bernardino | 127 | Pavement | Mill and Overlay Pavement | 10.5 | 37.7 | $15.40 |
San Bernardino | 395 | Pavement | MILL 0.10'AND OVERLAY 0.20' RUBBERIZED ASPHALT WITH DIGOUTS | 0 | 35.5 | $17.10 |
San Bernardino | 395 | Pavement | Pavement Preservation | 3.9 | 45.9 | $22.30 |