Senate District 3
Bill Dodd Napa
Over half of all state and local roads are rated in poor condition, require safety improvements and fail to meet earthquake safety standards. The Road Repair and Accountability Act makes sure both state and local agencies have the resources they need to ensure our CA roads and bridges are up to safety standards.
See how this legislation will improve transportation and create tens of thousands of jobs in California with detailed information about annual allocations and projects slated to happen right here in our community.
Local Government Funding
Information on how much money our local governments will receive annually as part of new funding package.
Upcoming Projects
The State and regional transportation agencies will now be able to complete projects that were halted in 2016 due to inadequate funding.
Major Congestion Relief Funding Opportunities
Millions of additional dollars will be spent to create better solutions for congested corridors, trade corridors, self help counties.
Senate District 3: Additional projects slated to be funded Download the PDF | View Postmile Tool
County | Route | Category | Project Description | Begin Postmile | End Postmile | Estimated Cost ($M) |
---|---|---|---|---|---|---|
Napa | 29 | Bridge | Br No 21-0049 Napa River BOH | 6.99 | 6.99 | $20.54 |
Napa | 29 | Bridge | Bridge rail replacement/upgrade - BR#21-0048, 21-0014, 21-0051, and 21-0047 | 14.11 | 19.04 | $7.60 |
Napa | 29 | Bridge | Bridge rail replacement/upgrade - BR#21-0016 and 21- 0017 | 28.43 | 29.29 | $7.00 |
Napa | 121 | Bridge | Replace Bridge- Tulucay Creek Bridge #21-0003 | 6.42 | 6.42 | $13.80 |
Napa | 128 | Bridge | Replace Hopper Slough BR#21-0019 | 5.12 | 5.1 | $15.70 |
Sacramento | 5 | Bridge | Bridge Preservation | 6.2 | 6.2 | $2.00 |
Solano | 80 | Bridge | Replace bridge of Rte. 80/29 Sep #23-0087 | 1.14 | 1.14 | $4.83 |
Sacramento | 12 | Bridge | Replace Elevators at the Sacramento River Bridge (Br No. 23-0024) | 0 | 0.4 | $19.70 |
Sacramento | 160 | Bridge | MD - MECH ELECT | L6.98 | L6.98 | $5.90 |
Solano | 84 | Bridge | Cache Slough Ferry (Real McCoy) Fender Rehabilitation | 2.49 | 2.49 | $16.80 |
Yolo | 5 | Bridge | Transportation Permit Requirement for Bridges | 4.4 | R28.9 | $4.10 |
Sonoma | 101 | Bridge | Sub-structure rehab/scour mitigation- San Antonio Creek bridge #20 0019R | 0.01 | 0.01 | $2.86 |
Yolo | 505 | Bridge | Seismic restoration - Putah Creek Bridges (Br#22-0072 R/L) on I505, 0.4 miles south of Jct 128 and 505 in Winters. | 0 | 0 | $3.74 |
Yolo | 505 | Bridge | Upgrade to current seismic standards. | 0 | 1 | $3.70 |
Sonoma Napa | 29 12 101 | Bridge | Br No 21-0018 Napa River, Br No 20-0027 Sonoma Creek, Br No 20-0172 Todd Road Overcrossing , Br No 20 0176 Hearn Avenue Overcrossing , Br No 20-0173 Baker Avenue Overcrossing | 37.03 | 37.03 | $3.94 |
Yolo Colusa | 5 | Bridge | Vertical Clearance | R26.65 R2.3 | R26.65 R13.75 | $21.78 |
Sonoma Sonoma Marin | 101 101 101 | Bridge | Baluster bridge rail replacement | 16.54 19.0 15.57 | 16.54 19.0 15.57 | $13.80 |
Contra Costa | 24 | Bridge | Structure Rehab | R0.01 | R0.01 | $289.00 |
Napa | 29 | Drainage | Rehabilitate Culverts near American Canyon at 0.2 mile south of North Kelly Road | 1.7 5.1 | 1.7 5.1 | $2.50 |
Solano | 80 | Drainage | Rehabilitate Culverts near Fairfield, from Lynch Road to Red Top Road | R10.0 | R11.2 | $3.90 |
Contra Costa | Var | Mobility | Weigh station improvements | Var | Var | $1.30 |
Contra Costa | Various | Mobility | Restoration of Non-Operational Vehicle Detection Devices | Various | Various | $4.75 |
Contra Costa Solano Sonoma | Var | Mobility | Upgrade Ramp Metering Controller in Contra Costa, Solano, Sonoma, replace Model 170 with Model 2070 and Replace "METER ON" Ped-Head Signs. | Var | Var | $7.26 |
Napa | 121 | Mobility | Improve Intersection Operation | 7.1 | 7.5 | $10.00 |
San Mateo Solano | var | Mobility | Modify signal/ install signal | var | var | $1.30 |
Solano | 80 | Mobility | In Vallejo on Route 80 from 0.1 km east of Route 29 separation to 0.2 km east of Redwood St. Overcrossing - Lengthen deceleration lanes on exit ramps and construct retaining walls and soundwalls | 1.1 | 1.1 | $10.50 |
Sacramento | Various | Mobility | Upgrade existing Traffic Management System/AVC systems at various locations | Various | Various | $3.30 |
VAR | Various | Mobility | Repair and replace non-functional field elements and video detectors that are currently not in service or damaged. These detection systems under Tier 1 priority corridor, need immedidate repairs and replacements. | Various | Various | $2.00 |
Solano | Var | Mobility | Weigh station improvements | Var | Var | $1.30 |
Sonoma Marin Napa Solano | Various | Mobility | Restoration of Non-Operational Vehicle Detection Devices | Various | Various | $9.02 |
Alameda Contra Costa | var | Mobility | Modify signal/ install signal | var | var | $1.20 |
Various | Various | Mobility | Restoration of Non-Operational Vehicle Detection Devices | Various | Various | $9.51 |
Napa | 29 | Pavement | Pavement preservation (CAPM) | 29.3 | 36.9 | $0.00 |
Napa | 29 | Pavement | In Calistoga from junct Rte 128 to 0.25m north of Silverado Trail | 36.8 | 38.1 | $10.34 |
Napa | 121 | Pavement | soldier pile wall | 17.4 | 17.4 | $2.54 |
Napa | 128 | Pavement | Route 29 in Rutherford to Knoxville Road | 4.6 | 19 | $12.00 |
Solano | 37 | Pavement | From Son/Sol County line to Wilson Ave | 0 | 12 | $12.00 |
Solano | 80 | Pavement | Carquinez Bridge to Redwood Overcrossing | 0.5 | 4.5 | $18.00 |
Solano | 80 | Pavement | Rock Slope Protection, regrading, lined ditch | 0.9 | 28.3 | $1.65 |
Solano | 80 | Pavement | Roadway rehabilitation (2R) Phase 3 of previous C,S & OL Project | 15 | 30.7 | $21.60 |
Sacramento | 99 | Pavement | Drainage Rehabilitation | 8.76 | 8.76 | $1.00 |
Solano | 113 | Pavement | C Street in Dixon to Route 80 | 19.4 | 21.3 | $5.00 |
Sonoma | 37 | Pavement | Marin County Line to Solano County Line | 0 | 6.2 | $9.19 |
Yolo | 84 | Pavement | Roadway rehabilitation | 13.2 | 15.8 | $8.40 |
Contra Costa | 80 | Pavement | Roadway rehabilitation (2R) | 10.1 | 13.5 | $76.76 |