Senate District 16
Over half of all state and local roads are rated in poor condition, require safety improvements and fail to meet earthquake safety standards. The Road Repair and Accountability Act makes sure both state and local agencies have the resources they need to ensure our CA roads and bridges are up to safety standards.
See how this legislation will improve transportation and create tens of thousands of jobs in California with detailed information about annual allocations and projects slated to happen right here in our community.
Local Government Funding
Information on how much money our local governments will receive annually as part of new funding package.
Upcoming Projects
The State and regional transportation agencies will now be able to complete projects that were halted in 2016 due to inadequate funding.
Senate District 16: Additional projects slated to be funded Download the PDF | View Postmile Tool
County | Route | Category | Project Description | Begin Postmile | End Postmile | Estimated Cost ($M) |
---|---|---|---|---|---|---|
San Bernardino | 15 | Bridge | Deck / Superstructure preventative Maint. | VAR | VAR | $1.70 |
San Bernardino | 40 | Bridge | Essex Rd Overcrossing SUBSTRUCTURE AND SUPERSTRUCTURE WORK AND ACCESS OPENINGS | 99.3 | 0 | $1.30 |
Kern | 155 | Bridge | Seismic Retrofit | 69.9 | 70.2 | $3.00 |
San Bernardino | 40 | Bridge | Bridge Scour Mitigation: Foundation rehab/replacement NEAR NEEDLES AT HALFWAY HILLS WASH (BR #54- 0799L/R) | 101.3 | 101.3 | $13.40 |
San Bernardino | 40 | Bridge | Arbol Ditch -FOUNDATION REHAB/REPLACEMENT | R129.78 | R129.78 | $12.01 |
San Bernardino | 40 | Bridge | CALIFORNIA/ARIZONA STATE LINE AT COLORADO RIVER BRIDGE (BR #54-0415) | R153.9 | R154.64 | $102.00 |
San Bernardino | 40 | Bridge | FOUNDATION REHAB/REPLACEMENT - 4 locations/bridges | VAR | VAR | $7.01 |
Tulare | 245 | Bridge | Upgrade Rail | 1.39 | 4.19 | $20.91 |
Los Angeles | 5 | Bridge | In LA and Kern Counties on LA-5 between Los Feliz Bl. Overcrossing and LA/Kern Co. line (PM 24.2/R88.6) and on Ker-5 between LA/Kern Co. Line and Route 5/99 Separation (PM 0.0/15.82) - Bridges Rehabilitation and Replacement. | 24.2 | R88.6 | $500.00 |
Los Angeles | 5 | Bridge | Tejon Pass Overcrossing 53 1779 Seismic Retrofit | 87.37 | 87.37 | $3.25 |
Riverside, San Bernardino | 10, 40 | Bridge | Scour Mitigation Needs | VAR | VAR | $2.51 |
San Bernardino | 18 | Drainage | Repair & replace culverts | 44.3 | 68 | $5.70 |
Kern Fresno | 119 198 | Drainage | Replace, reline Culverts | 29 13.5 | 30.5 18.2 | $1.20 |
Kern Kings | 99 198 204 | Drainage | Replace Obsolete Pumps | Various | Various | $11.32 |
Madera Fresno Tulare | 99 | Drainage | Replace Obsolete Pumps | Various | Various | $11.30 |
Tulare | 190 | Drainage | Replace Reline Culverts | 34.7 | 39.4 | $5.03 |
Kern | 5 | Drainage | Replace, reline Culverts | 5.97 | 9.6 | $3.20 |
Kern | 5 | Drainage | Replace, reline Culverts | 8.7 | 9.78 | $15.15 |
Kern | 5 | Drainage | Replace, reline Culverts | 9.72 | 9.75 | $3.05 |
Kern | 5 | Drainage | Replace, reline Culverts | 9.75 | 9.78 | $3.05 |
San Bernardino | 40 | Mobility | Newberry WIM | 28.9 | 28.9 | $1.50 |
San Bernardino | 40 | Mobility | Weigh In Motion Scale | TBD | TBD | $0.60 |
Kern | 202 | Mobility | Tucker Valley Intersection | 8.85 | R8.9 | $3.00 |
Fresno, Kern | VAR | Mobility | Install Changeable Message Signs | VAR | VAR | $3.50 |
VAR | Various | Mobility | Vehicle Detection System Repair | Various | Various | $2.40 |
VAR | Various | Mobility | Vehicle Detection System Repair | Various | Various | $1.25 |
Various | Various | Mobility | Vehicle Detection System Repair | Various | Various | $6.56 |
Riverside/ San Bernardino | VAR | Mobility | REPLACE DEGRADED CLOSED CIRCUIT TELEVISION WITH DIGITAL CAMERAS | VAR | VAR | $4.48 |
San Bernardino | 15 | Pavement | Grind and Overlay | R136.9 | R186.2 | $46.60 |
Kern | 14 | Pavement | Pavement Preservation | 0 | 14.5 | $8.90 |
Kern | 14 | Pavement | Mojave Rosamond Rehab | 0 | 14.5 | $8.90 |
Kern | 14 | Pavement | Mojave Pavement Rehabilitation | 15.8 | 17.6 | $3.90 |
San Bernardino | 18 | Pavement | Rehab Drainage | TBD | TBD | $4.80 |
Kern | 14 | Pavement | Freeman III Pavement Rehabilitation | 46.2 | 53 | $3.90 |
San Bernardino | 18 | Pavement | Reconstruct Slope | VAR | VAR | $4.72 |
Kern | 58 | Pavement | Tehachapi Rehab | 90.5 | 100 | $24.70 |
Kern | 119 | Pavement | Pavement Rehabilitation (3R) | 28.3 | 31.28 | $8.00 |
Kern | 166 | Pavement | Pavement Rehabilitation (3R) | 0 | 9 | $12.50 |
Kern | 184 | Pavement | Pavement Rehabilitation (3R) | 0.8 | 8.3 | $13.30 |
Kern | 184 | Pavement | Pavement Preservation | 8.3 | 12.13 | $12.05 |
Kern | 204 | Pavement | Pavement Preservation | 5.1 | 6.7 | $5.24 |
San Bernardino | 58 | Pavement | ROADWAY REHABILITATION (ADDITIONAL FUNDING FOR EA 34770) | 8.2 | 12.9 | $0.00 |
Kern | 33 | Pavement | Pavement Preservation | 34.2 | 60.1 | $11.30 |
San Bernardino | 95 | Pavement | Pavement Preservation | 64.5 | 80.5 | $9.60 |
Kern | 5 | Pavement | Pavement Rehab (2R) | 10.2 | 15.8 | $23.00 |
San Bernardino | 127 | Pavement | Mill and Overlay Pavement | 10.5 | 37.7 | $15.40 |
Kern | 58 | Pavement | Pavement Rehab (2R) | 64.4 | 67 | $6.10 |
San Bernardino | 395 | Pavement | MILL 0.10'AND OVERLAY 0.20' RUBBERIZED ASPHALT WITH DIGOUTS | 0 | 35.5 | $17.10 |
San Bernardino | 395 | Pavement | Pavement Preservation | 3.9 | 45.9 | $22.30 |
Tulare | 63 | Pavement | Pavement Preservation | 0 | 5.8 | $12.00 |
Tulare | 99 | Pavement | Pavement Rehab (2R) | 27.6 | 30.6 | $6.00 |
Kern | 5 | Pavement | Drainage System Restoration | 4.1 | 5.89 | $2.50 |
Kern | 5 | Pavement | Drainage System Restoration | 9.78 | 9.8 | $3.05 |
San Bernardino | 15 | Pavement | Pavement Preservation | 75.3 | 123.9 | $58.30 |
Kern | 5 | Pavement | Drainage System Restoration | 9.8 | 9.85 | $3.05 |
San Bernardino | 15 | Pavement | GRIND AND OVERLAY PAVEMENT | 75.3 | 186.2 | $58.30 |
Kern | 5 | Pavement | Drainage System Restoration | 9.9 | 10.5 | $1.00 |
San Bernardino | 15 | Pavement | Grind and Overlay | 75.3 | R124.2 | $46.70 |
Kern | 5 | Pavement | Pavement Preservation | 10.2 | 15.9 | $8.10 |