Senate District 3

Bill Dodd Napa

Over half of all state and local roads are rated in poor condition, require safety improvements and fail to meet earthquake safety standards. The Road Repair and Accountability Act makes sure both state and local agencies have the resources they need to ensure our CA roads and bridges are up to safety standards.

See how this legislation will improve transportation and create tens of thousands of jobs in California with detailed information about annual allocations and projects slated to happen right here in our community.

Local Government Funding

Information on how much money our local governments will receive annually as part of new funding package.

View local funding

Upcoming Projects

The State and regional transportation agencies will now be able to complete projects that were halted in 2016 due to inadequate funding.

View some projects slated to be restored

Major Congestion Relief Funding Opportunities

Millions of additional dollars will be spent to create better solutions for congested corridors, trade corridors, self help counties.

View regional funding

 

Senate District 3: Additional projects slated to be funded Download the PDF | View Postmile Tool

County Route Category Project Description Begin Postmile End Postmile Estimated Cost ($M)
Sacramento 5 Bridge Bridge Preservation 6.2 6.2 $2.00
Sacramento 12 Bridge Replace Elevators at the Sacramento River Bridge (Br No. 23-0024) 0 0.4 $19.70
Sacramento 99 Pavement Drainage Rehabilitation 8.76 8.76 $1.00
Sacramento 160 Bridge MD - MECH ELECT L6.98 L6.98 $5.90
Sacramento Various Mobility Upgrade existing Traffic Management System/AVC systems at various locations Various Various $3.30
VAR Various Mobility Repair and replace non-functional field elements and video detectors that are currently not in service or damaged. These detection systems under Tier 1 priority corridor, need immedidate repairs and replacements. Various Various $2.00
Yolo 5 Bridge Transportation Permit Requirement for Bridges 4.4 R28.9 $4.10
Yolo 84 Pavement Roadway rehabilitation 13.2 15.8 $8.40
Yolo 505 Bridge Seismic restoration - Putah Creek Bridges (Br#22-0072 R/L) on I505, 0.4 miles south of Jct 128 and 505 in Winters. 0 0 $3.74
Yolo 505 Bridge Upgrade to current seismic standards. 0 1 $3.70
Yolo Colusa 5 Bridge Vertical Clearance R26.65 R2.3 R26.65 R13.75 $21.78
Alameda Contra Costa var Mobility Modify signal/ install signal var var $1.20
Contra Costa 24 Bridge Structure Rehab R0.01 R0.01 $289.00
Contra Costa 80 Pavement Roadway rehabilitation (2R) 10.1 13.5 $76.76
Contra Costa Var Mobility Weigh station improvements Var Var $1.30
Contra Costa Various Mobility Restoration of Non-Operational Vehicle Detection Devices Various Various $4.75
Contra Costa Solano Sonoma Var Mobility Upgrade Ramp Metering Controller in Contra Costa, Solano, Sonoma, replace Model 170 with Model 2070 and Replace "METER ON" Ped-Head Signs. Var Var $7.26
Napa 29 Bridge Br No 21-0049 Napa River BOH 6.99 6.99 $20.54
Napa 29 Bridge Bridge rail replacement/upgrade - BR#21-0048, 21-0014, 21-0051, and 21-0047 14.11 19.04 $7.60
Napa 29 Bridge Bridge rail replacement/upgrade - BR#21-0016 and 21- 0017 28.43 29.29 $7.00
Napa 29 Pavement Pavement preservation (CAPM) 29.3 36.9 $0.00
Napa 29 Pavement In Calistoga from junct Rte 128 to 0.25m north of Silverado Trail 36.8 38.1 $10.34
Napa 29 Drainage Rehabilitate Culverts near American Canyon at 0.2 mile south of North Kelly Road 1.7 5.1 1.7 5.1 $2.50
Napa 121 Bridge Replace Bridge- Tulucay Creek Bridge #21-0003 6.42 6.42 $13.80
Napa 121 Mobility Improve Intersection Operation 7.1 7.5 $10.00
Napa 121 Pavement soldier pile wall 17.4 17.4 $2.54
Napa 128 Pavement Route 29 in Rutherford to Knoxville Road 4.6 19 $12.00
Napa 128 Bridge Replace Hopper Slough BR#21-0019 5.12 5.1 $15.70
San Mateo Solano var Mobility Modify signal/ install signal var var $1.30
Solano 37 Pavement From Son/Sol County line to Wilson Ave 0 12 $12.00
Solano 80 Pavement Carquinez Bridge to Redwood Overcrossing 0.5 4.5 $18.00
Solano 80 Pavement Rock Slope Protection, regrading, lined ditch 0.9 28.3 $1.65
Solano 80 Mobility In Vallejo on Route 80 from 0.1 km east of Route 29 separation to 0.2 km east of Redwood St. Overcrossing - Lengthen deceleration lanes on exit ramps and construct retaining walls and soundwalls 1.1 1.1 $10.50
Solano 80 Bridge Replace bridge of Rte. 80/29 Sep #23-0087 1.14 1.14 $4.83
Solano 80 Pavement Roadway rehabilitation (2R) Phase 3 of previous C,S & OL Project 15 30.7 $21.60
Solano 80 Drainage Rehabilitate Culverts near Fairfield, from Lynch Road to Red Top Road R10.0 R11.2 $3.90
Solano 84 Bridge Cache Slough Ferry (Real McCoy) Fender Rehabilitation 2.49 2.49 $16.80
Solano 113 Pavement C Street in Dixon to Route 80 19.4 21.3 $5.00
Solano Var Mobility Weigh station improvements Var Var $1.30
Sonoma 37 Pavement Marin County Line to Solano County Line 0 6.2 $9.19
Sonoma 101 Bridge Sub-structure rehab/scour mitigation- San Antonio Creek bridge #20 0019R 0.01 0.01 $2.86
Sonoma Marin Napa Solano Various Mobility Restoration of Non-Operational Vehicle Detection Devices Various Various $9.02
Sonoma Napa 29 12 101 Bridge Br No 21-0018 Napa River, Br No 20-0027 Sonoma Creek, Br No 20-0172 Todd Road Overcrossing , Br No 20 0176 Hearn Avenue Overcrossing , Br No 20-0173 Baker Avenue Overcrossing 37.03 37.03 $3.94
Sonoma Sonoma Marin 101 101 101 Bridge Baluster bridge rail replacement 16.54 19.0 15.57 16.54 19.0 15.57 $13.80
Various Various Mobility Restoration of Non-Operational Vehicle Detection Devices Various Various $9.51