Bridge Preservation Category: BridgeEnd Postmile: 23.5Begin Postmile: 23.5Region: Sacramento RegionRoute: 99
Replacing existing communication lines with fiber optics to improve performance Category: MobilityEnd Postmile: R24.3Begin Postmile: 10Region: Sacramento RegionRoute: 99
Remove and Replace Hot Mix Asphalt Category: PavementEnd Postmile: 12.9Begin Postmile: M9.6Region: Sacramento RegionRoute: 80
Rail Upgrade on 8 BR 24 0131 0153 0117 0124K 0291L 0293R SAC 80 PM 5 2 8 9 BR NO 24 0218 0203 0205 Category: BridgeEnd Postmile: 8.52Begin Postmile: 1.77Region: Sacramento RegionRoute: 51
Ramp Meters and Traffic Management System Upgrades Category: MobilityEnd Postmile: 6Begin Postmile: 0Region: Sacramento RegionRoute: 51
Drainage Rehabilitation Category: PavementEnd Postmile: R0.11Begin Postmile: R0.11Region: Sacramento RegionRoute: 50
Rehab Pavement Category: PavementEnd Postmile: R5.3Begin Postmile: L0.6Region: Sacramento RegionRoute: 50
RAIL UPGRADE Category: BridgeEnd Postmile: 13.94Begin Postmile: 0.38Region: Sacramento RegionRoute: 50
Remove and Replace Hot Mix Asphalt Category: PavementEnd Postmile: 34.6Begin Postmile: 25.2Region: Sacramento RegionRoute: 5
Super structure strengthening Category: BridgeEnd Postmile: 23.59Begin Postmile: 23.59Region: Sacramento RegionRoute: 5