Roadway rehabilitation 2R Phase 3 of previous C S OL Project Category: PavementEnd Postmile: 30.7Begin Postmile: 15Region: Bay AreaRoute: 80
Replace bridge of Rte 80 29 Sep 23 0087 Category: BridgeEnd Postmile: 1.14Begin Postmile: 1.14Region: Bay AreaRoute: 80
In Vallejo on Route 80 from 0 1 km east of Route 29 separation to 0 2 km east of Redwood St Overcrossing Lengthen deceleration lanes on exit ramps and construct retaining walls and soundwalls Category: MobilityEnd Postmile: 1.1Begin Postmile: 1.1Region: Bay AreaRoute: 80
Rock Slope Protection regrading lined ditch Category: PavementEnd Postmile: 28.3Begin Postmile: 0.9Region: Bay AreaRoute: 80
Modify signal install signal Category: MobilityEnd Postmile: varBegin Postmile: varRegion: Bay AreaRoute: var
Replace Hopper Slough BR 21 0019 Category: BridgeEnd Postmile: 5.1Begin Postmile: 5.12Region: Bay AreaRoute: 128
Replace Bridge Tulucay Creek Bridge 21 0003 Category: BridgeEnd Postmile: 6.42Begin Postmile: 6.42Region: Bay AreaRoute: 121
Rehabilitate Culverts near American Canyon at 0 2 mile south of North Kelly Road Category: DrainageEnd Postmile: 1.7 5.1Begin Postmile: 1.7 5.1Region: Bay AreaRoute: 29
In Calistoga from junct Rte 128 to 0 25m north of Silverado Trail Category: PavementEnd Postmile: 38.1Begin Postmile: 36.8Region: Bay AreaRoute: 29