Senate District 28
Over half of all state and local roads are rated in poor condition, require safety improvements and fail to meet earthquake safety standards. The Road Repair and Accountability Act makes sure both state and local agencies have the resources they need to ensure our CA roads and bridges are up to safety standards.
See how this legislation will improve transportation and create tens of thousands of jobs in California with detailed information about annual allocations and projects slated to happen right here in our community.
Local Government Funding
Information on how much money our local governments will receive annually as part of new funding package.
Upcoming Projects
The State and regional transportation agencies will now be able to complete projects that were halted in 2016 due to inadequate funding.
Major Congestion Relief Funding Opportunities
Millions of additional dollars will be spent to create better solutions for congested corridors, trade corridors, self help counties.
Senate District 28: Additional projects slated to be funded Download the PDF | View Postmile Tool
County | Route | Category | Project Description | Begin Postmile | End Postmile | Estimated Cost ($M) |
---|---|---|---|---|---|---|
Riverside | 10 | Bridge | Seismic -Thousand Palms Wash | R53.8 | R53.8 | $1.51 |
Riverside | 74 | Bridge | Bridge Rail (2 bridges) | 49.1 | 50.29 | $1.60 |
Riverside, San Bernardino | 10, 40 | Bridge | Scour Mitigation Needs | VAR | VAR | $2.51 |
Riverside | 15 | Mobility | INSTALL CHANGEABLE MESSAGE SIGNS | 19.1 | 20.9 | $2.70 |
Riverside | 111 | Bridge | Bridge Rail (4 Bridges) | 55.8 | R60.1 | $2.80 |
Riverside | 74 | Pavement | Rehab Drainage | 41.3 | 92.3 | $3.20 |
Riverside | 111 371 | Bridge | Seismic Restoration 56.0284,56.0285, 56.0492 | 6.6 8 74.2 | 6.6 8 74.2 | $3.90 |
Riverside/ San Bernardino | VAR | Mobility | REPLACE DEGRADED CLOSED CIRCUIT TELEVISION WITH DIGITAL CAMERAS | VAR | VAR | $4.48 |
Riverside | Various | Mobility | Intelligent TraffOvercrossing System/Traffic Management System | Various | Various | $5.20 |
Riverside | 10 | Bridge | STRENGTHEN BRIDGE- Colorado River 56-0008 | 99 | 0 | $6.00 |
Riverside | 10 | Bridge | FOUNDATION REHAB/REPLACEMENT - various locations/bridges | VAR | VAR | $7.01 |
Riverside | 10 | Bridge | REPLACE EXISTING ROCK SLOPE PROTECTION | R106.6 | R113.8 | $7.90 |
Riverside | 111 | Pavement | Mill and Overlay | 47.2 | 55.3 | $9.10 |
Riverside | 74 | Pavement | Mill and Overlay and include digouts | 17.2 | 25.7 | $9.20 |
Riverside | 10 | Pavement | Grind and Overlay | 29.3 | 38.5 | $9.94 |
Riverside | 10 | Bridge | REPLACE EXISTING ROvercrossing K SLOPE PROTECTION | R120.7 | R142.7 | $11.20 |
Riverside | 74 | Bridge | Replace/rail upgrade #56.0169 and #56.0180 | 2.9 53.4 | 3.2 54.7 | $11.90 |
Riverside | 10 | Bridge | REPLACE EXISTING ROvercrossing K SLOPE PROTECTION | R92.9 | R101.1 | $12.90 |
Riverside | 10 | Pavement | Mill and Overlay | 25.1 | 44.4 | $37.10 |
Riverside | 10 | Pavement | Grind and Overlay | 52.2 | 57.6 | $41.50 |
Riverside | 74 | Pavement | MILL AND OVERLAY PAVEMENT AND INCLUDE DIGOUTS | 46.1 | 71.7 | $44.73 |
Riverside | 10 | Pavement | Mill and Overlay | 25.1 | 44.4 | $46.30 |
Riverside | 10 | Pavement | Rehab mainline pavement, shoulders and ramps | 60.9 | 74 | $52.40 |
Riverside | 10 | Pavement | Replace outside two lanes, slab replacement, mill and overlay ramps and shoulders (Segment 1:0.0/8.2, Segment 2:57.2/57.6) | 0 | 57.6 | $108.80 |
Riverside | 10 | Pavement | Rehab mainline pavement, shoulders and ramps | 105 | 134 | $116.01 |
Riverside | 10 | Pavement | REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS | 60.9 | 145.2 | $258.40 |