Senate District 20
Connie Leyva Chino
Over half of all state and local roads are rated in poor condition, require safety improvements and fail to meet earthquake safety standards. The Road Repair and Accountability Act makes sure both state and local agencies have the resources they need to ensure our CA roads and bridges are up to safety standards.
See how this legislation will improve transportation and create tens of thousands of jobs in California with detailed information about annual allocations and projects slated to happen right here in our community.
Local Government Funding
Information on how much money our local governments will receive annually as part of new funding package.
Upcoming Projects
The State and regional transportation agencies will now be able to complete projects that were halted in 2016 due to inadequate funding.
Major Congestion Relief Funding Opportunities
Millions of additional dollars will be spent to create better solutions for congested corridors, trade corridors, self help counties.
View Southern California funding | View Inland Empire funding
Senate District 20: Additional projects slated to be funded Download the PDF | View Postmile Tool
County | Route | Category | Project Description | Begin Postmile | End Postmile | Estimated Cost ($M) |
---|---|---|---|---|---|---|
San Bernardino | 15 | Bridge | Deck / Superstructure preventative Maint. | VAR | VAR | $1.70 |
San Bernardino | 10 | Bridge | Deck / Superstructure preventative Maint. Mt. Vernon Ave. (54-0459) Raise Bridge Permit | 23.25 | 23.25 | $1.91 |
San Bernardino | 10 | Mobility | WIDEN RAMP FROM ONE LANE TO TWO LANES AT THE EB ON-RAMP | 22.1 | 22.1 | $2.25 |
Riverside, San Bernardino | 10, 40 | Bridge | Scour Mitigation Needs | VAR | VAR | $2.51 |
San Bernardino | 15 | Pavement | Upgrade signs and lighting | 2.02 | 186 | $2.54 |
San Bernardino | 10 18 215 | Bridge | 4 bridges; GRIND Portland Cement Concrete DECK & PLACE POLYESTER OVERLAY, REPLACE JOINT SEALS, REPAIR FIRE DAMAGE & REPAIR/REPLACE BRACING & WIND BRACING | 22.4 95.4 3.7 | 22.4 95.4 3.7 | $4.10 |
Riverside/ San Bernardino | VAR | Mobility | REPLACE DEGRADED CLOSED CIRCUIT TELEVISION WITH DIGITAL CAMERAS | VAR | VAR | $4.48 |
San Bernardino | 10,15 | Bridge | Seismic -West Redlands Overhead and S15-E10 Connector Overcrossing | 27.64/2.41 | 27.64/2.41 | $5.01 |
San Bernardino | 60 | Mobility | Add Auxiliary lane , deceleration lane, widen ramps and bridges | R6.48 | R7.87 | $6.00 |
San Bernardino | 60 | Mobility | Traffic Management System/Mobility | R7.35 | R9.11 | $6.00 |
San Bernardino | 215 | Mobility | NSTALL FOC BACKBONE, RMS, Changeable Message Sign, Closed Circuit Television, Vehicle Detection System, ESU, Traffic Operation System, HUB & WIDEN ON-RAMPS | 7 | 17.8 | $6.38 |
San Bernardino | 71 | Mobility | TRAFFIC MANAGEMENT SYSTEMS (ALSO RIV-71- R0.0/G3.32; SBD-71 NR CHINO HILLS FR LA CO LN TO RIV CO LN & RIV-71 NR CORONA FR SBD CO LN TO JCT RTE 91 ) | 0 | 8.48 | $9.00 |
Los Angeles | 14, 57, 60 | Mobility | In Los Angeles County on Routes 14, 57, 60, Upgrade Traffic Signal Communication System to Accommodate New Central System | VAR | VAR | $10.90 |
San Bernardino | 66 215 | Bridge | Upgrade Rail | 21.3 14.93 | 21.3 14.93 | $11.46 |
Los Angeles | 10 | Mobility | Repair/Replace/Restore damaged Intelligent TraffOvercrossing System detection elements on Rte 10 (S 0.18/47.6), on Rte 57 (R0.62/R11.36), on Rte 60 (0.45/R30.37), on Rte 71 (R0.84/R3.89), on Rte 210 (R22.32/R 36.33) and (R36.6/R46.65), on Rte 605 (20.88/25.9), & hubs on Routes 2 (18.6), 5 (6.8), 10 (18.3), 405, 605 | S0.18 | 47.6 | $13.51 |
San Bernardino | 66 | Pavement | Mill and Overlay | 20.1 | 23.2 | $14.77 |
Los Angeles | 138 39 71 | Bridge | 53 0113 San Gabriel River 53 2052 Ridgeway St Undercrossing 53 2174 California Aqueduct Seismic Retrofit | 70.28 17.82 R0.92 | 70.28 17.82 R0.92 | $31.53 |
San Bernardino | 215 | Pavement | Roadway Rehab | 3.7 | 7.3 | $31.70 |
San Bernardino | 10 | Pavement | Rehab mainline | 0 | 30.9 | $111.00 |