Senate District 9

Nancy Skinner Oakland

Over half of all state and local roads are rated in poor condition, require safety improvements and fail to meet earthquake safety standards. The Road Repair and Accountability Act makes sure both state and local agencies have the resources they need to ensure our CA roads and bridges are up to safety standards.

See how this legislation will improve transportation and create tens of thousands of jobs in California with detailed information about annual allocations and projects slated to happen right here in our community.

Local Government Funding

Information on how much money our local governments will receive annually as part of new funding package.

View local funding

Upcoming Projects

The State and regional transportation agencies will now be able to complete projects that were halted in 2016 due to inadequate funding.

View some projects slated to be restored

Major Congestion Relief Funding Opportunities

Millions of additional dollars will be spent to create better solutions for congested corridors, trade corridors, self help counties.

View regional funding

 

Senate District 9: Additional projects slated to be funded Download the PDF | View Postmile Tool

County Route Category Project Description Begin Postmile End Postmile Estimated Cost ($M)
Alameda 77880880880 Bridge Baluster bridge rail replacement 0.2915.6520.8226.53 0.2915.6520.8226.53 $13.00
Alameda 80 92 Bridge Br No 0023 University Ave Overcrossing , Br No 33 0093 Orchard Ave Underpass 5.82 7.26 5.82 7.26 $6.02
Alameda 13 Bridge Br No 33-0247 Lincoln Ave Overcrossing , Br No 33-0159 Park Blvd Overcrossing , Br No 0160 La Salle Ave Overcrossing , & Br No 330162 Broadway Terrace Undercrossing 6.47 6.47 $2.45
Alameda 77 Bridge Br No 0284 San Leandro Overcrossing , Br No 0283 Melrose Underpass 0.29 0.29 $0.66
Alameda 80 Bridge Br No 33-0061R Distribution structure 2.8 2.8 $5.47
Alameda 80 Bridge Vertical Clearance- University Ave Overcrossing Br. 33- 0023 and 13/80 Separation (North) Br. 33 0191G 5.82 5.82 $15.47
Alameda 580 Bridge Bridge preservation - Foothill Blvd Undercrossing # 33 0334K R35.0 R35.0 $0.99
Alameda 880 Bridge Sub-structure rehab/scour mitigation- East Creek Slough Br. No. 33-0143 27.23 27.23 $5.59
Alameda 980 Mobility Traffic Management Center network hardware lifecycle replacement 1.2 1.2 $4.79
Alameda Var Mobility 2-yr service contract to augment the Division of Traffic Operations in troubleshooting, repair, and upkeep the District Transportation Management System Var Var $10.00
Alameda Var Mobility Upgrade Ramp Meter Controller and Replace "METER ON" Ped-Head Signs. Var Var $7.26
Alameda Various Mobility Restoration of Non-Operational Vehicle Detection Devices Various Various $5.93
Alameda Contra Costa var Mobility Modify signal/ install signal var var $1.20
Contra Costa 80 Mobility Ramp improvements var var $2.40
Contra Costa Var Mobility Weigh station improvements Var Var $1.30
Contra Costa Various Mobility Restoration of Non-Operational Vehicle Detection Devices Various Various $4.75
Contra Costa Solano Sonoma Var Mobility Upgrade Ramp Metering Controller in Contra Costa, Solano, Sonoma, replace Model 170 with Model 2070 and Replace "METER ON" Ped-Head Signs. Var Var $7.26
Various Various Mobility Restoration of Non-Operational Vehicle Detection Devices Various Various $9.51
Alameda 580 Mobility Install Ramp Metering 30.81 47.35 $27.61
Alameda 580 Mobility Install Ramp Metering 30.81 47.35 $27.60
Alameda 880 Mobility Ramp Meter Upgrade/Replace/Relocate Type 1b RM Standard to Mastarm Type 0 32 $12.61
Alameda/ Contra Costa 24 Pavement Caldecott Tunnel, Bore-4, Br. 28-0015K R5.9/- -/0.1 $3.70
Contra Costa 80 Pavement Pavement preservation (CAPM) 0 10.1 $44.75
Contra Costa 123 Pavement Alameda County Line to Route 80 0 2.2 $5.06
Alameda 24 Pavement Pavement preservation (CAPM) 1.8 6.2 $0.00
Alameda 61 Pavement Pavement preservation (CAPM) 19.8 21.2 $3.30
Alameda 112 Pavement Route 61 to Route 185 0 1.8 $3.64
Alameda 123 Pavement Route 580 to Contra Costa County Line 0 5.2 $11.81
Alameda 260 Pavement Posey-Webster Tubes R1.2 R1.8 $3.70