Senate District 6
Dr. Richard Pan Sacramento
Over half of all state and local roads are rated in poor condition, require safety improvements and fail to meet earthquake safety standards. The Road Repair and Accountability Act makes sure both state and local agencies have the resources they need to ensure our CA roads and bridges are up to safety standards.
See how this legislation will improve transportation and create tens of thousands of jobs in California with detailed information about annual allocations and projects slated to happen right here in our community.
Local Government Funding
Information on how much money our local governments will receive annually as part of new funding package.
Upcoming Projects
The State and regional transportation agencies will now be able to complete projects that were halted in 2016 due to inadequate funding.
Major Congestion Relief Funding Opportunities
Millions of additional dollars will be spent to create better solutions for congested corridors, trade corridors, self help counties.
Senate District 6: Additional projects slated to be funded Download the PDF | View Postmile Tool
County | Route | Category | Project Description | Begin Postmile | End Postmile | Estimated Cost ($M) |
---|---|---|---|---|---|---|
Sacramento | 5 | Bridge | SUPER STRENGTHEN PERMIT | 22.42 | 22.42 | $1.00 |
Sacramento | 80 | Mobility | Repair loop detectors that are currently not in service or damaged. The detection systems under Tier 1 priority corridor need immediate repairs and replacements. | M3.51 | 12.42 | $1.30 |
VAR | Various | Mobility | Repair and replace non-functional field elements and video detectors that are currently not in service or damaged. These detection systems under Tier 1 priority corridor, need immedidate repairs and replacements. | Various | Various | $2.00 |
Sacramento | 51 | Mobility | Ramp Meters and Traffic Management System Upgrades | 0 | 6 | $2.40 |
Sacramento | 99 | Bridge | Bridge Preservation | 23.5 | 23.5 | $3.30 |
Sacramento | Various | Mobility | Upgrade existing Traffic Management System/AVC systems at various locations | Various | Various | $3.30 |
Sacramento | 50 | Pavement | Drainage Rehabilitation | R0.11 | R0.11 | $3.60 |
Sacramento | 99 | Mobility | Construct Auxilliary Lanes on SR99 NB & SB (between I-5 and West Elkhorn Blvd. | 32.5 | 33.5 | $4.95 |
Sacramento | 5 | Bridge | Super-structure strengthening | 23.59 | 23.59 | $7.50 |
Sacramento | 51/80 | Bridge | RAIL UPGRADE | VAR | VAR | $8.00 |
Sacramento | 51 | Bridge | Rail Upgrade on 8 BR: 24 0131, 0153, 0117, 0124K, 0291L, 0293R SAC 80 PM 5.2/8.9 BR.NO. 24 0218, 0203, 0205 | 1.77 | 8.52 | $8.10 |
Sacramento | 50 | Bridge | RAIL UPGRADE | 0.38 | 13.94 | $9.20 |
Sacramento | 99 | Mobility | Replacing existing communication lines with fiber optics to improve performance | 10 | R24.3 | $12.20 |
Sacramento | 80 | Pavement | Remove and Replace Hot Mix Asphalt | M9.6 | 12.9 | $18.20 |
Sacramento | 5 50 | Bridge | Bridge Preventive Maintenance (Paint) Sacramento River Viaduct (11 East ramps) | 22.15 L0.01 | 22.91 L0.44 | $19.60 |
Sacramento | 5 | Pavement | Remove and Replace Hot Mix Asphalt | 25.2 | 34.6 | $46.30 |
Sacramento | 50 | Pavement | Rehab Pavement | L0.6 | R5.3 | $156.70 |