Senate District 1
Over half of all state and local roads are rated in poor condition, require safety improvements and fail to meet earthquake safety standards. The Road Repair and Accountability Act makes sure both state and local agencies have the resources they need to ensure our CA roads and bridges are up to safety standards.
See how this legislation will improve transportation and create tens of thousands of jobs in California with detailed information about annual allocations and projects slated to happen right here in our community.
Local Government Funding
Information on how much money our local governments will receive annually as part of new funding package.
Restored Projects
Caltrans and regional transportation agencies will now be able to complete projects that were halted in 2016 due to inadequate funding.
Major Congestion Relief Funding Opportunities
Millions of additional dollars will be spent to create better solutions for congested corridors, trade corridors, self help counties.
Senate District 1: Additional projects slated to be funded Download the PDF | View Postmile Tool
County | Route | Category | Project Description | Begin Postmile | End Postmile | Estimated Cost ($M) |
---|---|---|---|---|---|---|
Shasta | 44 | Mobility | Closed Circuit Television | 1.24 | 1.24 | $0.22 |
Siskiyou | 3 | Mobility | Closed Circuit Television, Roadside Weather Information Station | 41.7 | 41.7 | $0.73 |
Modoc | 395 | Bridge | Deck Rehab, Paint, Joints, etc. | 26.71 | 26.71 | $1.03 |
Plumas | 70 | Bridge | In Plumas County at and near Howells at Various locations from Grizzly Creek Bridge to Greenhorn Creek Bridge | 0.67 | 23.67 | $1.07 |
Sierra | 49 | Bridge | SUB REPLACE | 34.26 | 34.26 | $1.20 |
Nevada | 20 | Mobility | On Nev 20 in Bear Valley add passing lane to permit passing of slow moving vehicles | 36.8 | 37 | $1.30 |
Shasta | 273 | Bridge | TBD | 14.77 | 14.77 | $1.33 |
Shasta | 44/89 | Mobility | Closed Circuit Television , Highway Advisory Radio, Changeable Message Sign | VAR | VAR | $1.41 |
Plumas | 147 | Pavement | Erosion Protection | 3.7 | 3.9 | $1.69 |
VAR | VAR | Pavement | Erosion Protection | VAR | VAR | $1.71 |
Sierra | 49 | Bridge | Seismic Retrofit 3 BR: SIE 49 Br # 13-0002, Br # 13-0005; Nev 20 Br # 17-0077 | R3.7 | 16.85 | $1.80 |
VAR | Var | Bridge | Deck Rehab, Paint, Joints, etc. | Var | Var | $1.80 |
Amador, Alpine | 88 | Mobility | Install Intelligent Traffic System elements for Carson Notification Systems for travellers to public recreations | 71.3, | 23.0, | $1.85 |
Shasta | 299 | Pavement | TBD | 10 | 90 | $1.85 |
Shasta | 5 | Pavement | TBD | 19 | 43 | $1.85 |
Nevada Placer | 20 193 | Mobility | Lengthen and Widen existing turnouts, add new turnouts at NEV 20 between five mile house and I-80 & PLA 193 at various locations | Various | Various | $1.91 |
Siskiyou | 96 | Bridge | Deck Rehab, Paint, Joints, etc. | Var | Var | $1.99 |
Nevada | 20 | Pavement | Drainage Rehabilitation | R12.2 | 20 | $2.35 |
Lassen | 395 | Pavement | Drainage Rehabilitation | 24 | 60 | $2.61 |
Placer | VAR | Mobility | Replace existing 70 incandescent Extinguishable Message Signs to Light Emitting Diode and upgrade the comm equip. Install Fiber Optics for existing Extinguishable Message Sign. Replace existing 4 FOG Extinguishable Message Signs with Light Emitting Diode | VAR | VAR | $2.90 |
Siskiyou | 5 | Bridge | In Siskiyou County near Mount Shasta at Azalea Road Overcrossing | 8.29 | 8.29 | $2.97 |
Shasta | 5 | Bridge | In Shasta County about 10 miles South of Lakehead at O'Brien Undercrossing | R32.16L | R32.16L | $2.97 |
Plumas | 70 | Bridge | In Plumas County near Keddie at 2.2 miles West of Spanish Creek Bridge | 32.9 | 33.3 | $3.00 |
Nevada | 20 | Mobility | Widen left turn pockets at Wash Ridge Rd and Harmony; Left turn pockets at Round Valley Rd and Quail Creek DR | Various | Various | $3.04 |
San Joaquin Alpine | 88 | Drainage | Replace drainage culverts that have exceeded their design life and deteriorated or failed | 13.5 0.28 | 14.1 2.56 | $3.24 |
San Joaquin, Alpine | 88 | Pavement | Culvert replacement or installation of Cured In Place Pipe (CIPP) liners | VAR | VAR | $3.24 |
Nevada | 80 | Bridge | Bridge Preservation | 2.4 | 2.4 | $3.30 |
Sierra | 89 | Bridge | Perry Creek Bridge Rail upgrade | 15.2 | 15.4 | $3.30 |
Sacramento | Various | Mobility | Upgrade existing Traffic Management System/AVC systems at various locations | Various | Various | $3.30 |
Lassen | 36 | Mobility | In Lassen County near Susanville at Susanville Maintenance Station | 22.48 | 22.48 | $3.50 |
VAR | Various | Bridge | In Trinity County at and near Happy Camp from 0.9 mile South of Salt Creek Bridge to 0.5 mile South of Dan Rice Creek Culvert. | Various | Various | $3.60 |
Shasta | 299 | Bridge | Deck Rehab, Paint, Joints, etc. | 8 | 92 | $3.76 |
VAR | 395 | Bridge | Deck Rehab, Paint, Joints, etc. | Var | Var | $3.76 |
Siskiyou | 96 | Bridge | In Siskiyou County about 7 miles East of Somes Bar from 0.6 mile East to 1.3 miles East of Irving Creek Bridge and from 1.6 miles East of Irving Creek Bridge to 2.6 miles West of Ti Creek. | Various | Various | $3.78 |
Plumas | 70 | Bridge | Bridge Preservation | Var | Var | $3.99 |
Placer | 80 | Pavement | Stabilize Cut Slope - Long Ravine | 34.4 | 34.5 | $4.00 |
Placer | 89 | Pavement | Stabilize Cut Slope - Squaw Valley | 14 | 14.2 | $4.00 |
Sacramento | 50 | Mobility | Install new Intelligent Transportation Systems Phase 2 | 12 | 23.2 | $4.00 |
Placer | 80 | Pavement | Drainage Rehab | 48.1 | 48.1 | $4.10 |
Nevada | 49 | Drainage | Drainage Rehabilitation | 0 | 7.5 | $4.10 |
Shasta | 5 | Bridge | In Shasta County in Redding at 0.1 mile South of route 44. | 15.43 | 15.43 | $4.17 |
El Dorado | 50 | Drainage | Drainage Rehabilitation | R13.7 | 23 | $4.20 |
Placer | 80 | Drainage | From Secret Town Overcrossing to Monte Vista Overcrossing | 38.3 | 43.1 | $4.20 |
Siskiyou | 96 | Bridge | In Siskiyou County at and near Happy Camp from 0.1 mile West of Indian Creek Bridge to 0.1 mile East of Bitten Bender Creek | 41 | 58 | $4.68 |
Shasta | 299 | Mobility | In Shasta County near Redding from 0.1 mile West of Kennedy Drive to 0.3 mile West of Rock Creek Road | 16.4 | 17.4 | $5.10 |
Nevada | 80 | Bridge | SUPER-MISC REPLACE HINGES | 22.41 | 22.41 | $5.30 |
Siskiyou | 96 | Drainage | In Siskiyou County East and West of Happy Camp. | 23 | 103.42 | $5.63 |
Sierra | 89 | Pavement | Hot Mix Asphalt Overlay | 19.95 | 29.58 | $5.68 |
Shasta | 5 | Bridge | Paint | 28.1 | 29 | $5.80 |
Siskiyou | 96 | Bridge | In Siskiyou County near Horse Creek from 0.4 mile West of Klamath River Bridge to 2 miles West of Kohl Creek. | 77.15 | 77.15 | $6.20 |
Shasta | 299 | Pavement | Repair localized areas of pavement failure, overlay with asphalt concrete. There are no curb ramps within the project limits. Hatchet Mtn -pavement restoration (West of Burney) | 60 | 67.9 | $6.26 |
El Dorado | 50 | Drainage | Drainage Rehabilitation | 2.7 | 13.76 | $6.29 |
El Dorado | 50 | Mobility | a) Placerville- Missouri Flat Rd Interchange, Placerville Dr/Forni Rd, Ray Lawyer Dr, Schnell School Rd. b) ED-50, PM0/80.44 | Various | Various | $6.60 |
Siskiyou | 5 | Bridge | Bridge Rehabilitation | 0 | 63 | $6.60 |
Shasta | 5 | Bridge | Bridge Rehabilitation | 0 | 60 | $7.10 |
Shasta | 5 | Pavement | Lakehead pavement restoration | 40.7 | 44.4 | $7.21 |
Nevada | 49 | Mobility | NB and SB Auxiliary lanes from McKnight Way to Route 20/Empire St Interchange | R13.5 | R14.4 | $7.60 |
Siskiyou | 5 | Bridge | In Siskiyou County in Dunsmuir at Sacramento River Bridge Overhead | 2.65 | 2.65 | $7.93 |
Siskiyou | 3 | Pavement | In Siskiyou County in Yreka on route 3 from 0.4 mile North of Laura Lane to Juniper Drive and on route 263 from route 3 to 0.2 mile North of Yreka City Safety Roadside Rest Area. | Various | Various | $8.80 |
El Dorado | 50 | Pavement | Road Rehabilitation | 63.7 | 67.3 | $9.00 |
Sacramento | 50 | Bridge | RAIL UPGRADE | 0.38 | 13.94 | $9.20 |
Siskiyou | Var | Pavement | Weed pavement restoration | Var | Var | $9.66 |
Shasta | 299 | Pavement | In Shasta County at and near Burney from 2.6 miles East of Carberry Flat Road to 0.3 mile East of Burney Mountain Power Road | 67.8 | 77.8 | $9.97 |
Siskiyou | 96 | Bridge | Bridge Replacement | 71.23 | 71.23 | $10.00 |
Nevada | 80 | Pavement | Stabilize Cut Slope - Iceland Grade | 24.9 | 26.6 | $10.60 |
Nevada | 80 | Pavement | Roadway Rehab | 13.5 | 15.5 | $10.93 |
Placer | 80 | Pavement | Portland Cement Concrete Lane Replacement | 68.5 | 69.7 | $12.60 |
El Dorado | 50 | Pavement | Road Rehabilitation | 58 | 63.7 | $14.30 |
Plumas | 89 | Pavement | West Almanor Rehab 3R | 30 | 42.2 | $17.17 |
Shasta | 299 | Pavement | Shasta College REHAB (2R) | 24.08 | 30.3 | $19.87 |
Siskiyou | 5 | Pavement | TBD | 6 | R15.9 | $23.76 |
Various | Various | Bridge | In Shasta, Siskiyou, Tehama, and Trinity Counties at Various locations | Various | Various | $27.16 |
Plumas | 70 | Pavement | In Plumas County at and near Cromberg from 0.2 mile East of Gill Ranch Road to 0.2 mile West of Big Grizzly Creek Bridge | 58.4 | 78.4 | $31.50 |
Siskiyou | 5 | Pavement | Grenada (2R) | 36 | 51.2 | $37.51 |