Senate District 32

Tony Mendoza Artesia

Over half of all state and local roads are rated in poor condition, require safety improvements and fail to meet earthquake safety standards. The Road Repair and Accountability Act makes sure both state and local agencies have the resources they need to ensure our CA roads and bridges are up to safety standards.

See how this legislation will improve transportation and create tens of thousands of jobs in California with detailed information about annual allocations and projects slated to happen right here in our community.

Local Government Funding

Information on how much money our local governments will receive annually as part of new funding package.

View local funding

Upcoming Projects

The State and regional transportation agencies will now be able to complete projects that were halted in 2016 due to inadequate funding.

View some projects slated to be restored

Major Congestion Relief Funding Opportunities

Millions of additional dollars will be spent to create better solutions for congested corridors, trade corridors, self help counties.

View regional funding

 

Senate District 32: Additional projects slated to be funded Download the PDF | View Postmile Tool

County Route Category Project Description Begin Postmile End Postmile Estimated Cost ($M)
Los Angeles 60 Mobility Upgrade Transportation Management System 0.55 11.7 $9.38
Los Angeles 91 Mobility In Los Angeles County from Rte 110 to Orange County Line R7.5 R20.7 $11.07
Los Angeles 105 Pavement Replace or Line drainage culverts 0 18.1 $1.00
Los Angeles 105 Bridge Paramount Blvd. Overcrossing 53 2425 (PM 14.65) & Ardis Ave Overcrossing 53 2572 (PM 16.39) R14.65 R16.39 $2.42
Los Angeles 605 Pavement Lane Replacement 0 10.24 $133.75
Los Angeles 605 Pavement Lane replacement 10.24 20.19 $133.75
Los Angeles 710 Bridge Hobart Yard Over Head Bridge Paint 22.17 22.17 $18.31
Los Angeles 710 Bridge East Yard Overhead Bridge Paint 22.66 22.66 $21.82
Los Angeles 14, 57, 60 Mobility In Los Angeles County on Routes 14, 57, 60, Upgrade Traffic Signal Communication System to Accommodate New Central System VAR VAR $10.90
Los Angeles 405, 710, 110, 005 Bridge 53 1208-LA-405-6.98-LBCH, 53 1231-LA-405-17.56- LNDL, 53 0785R-710-23.19-CMRC, 53 1492K-LA-110- 22.90-LA, 53 0787-LA-110-23.00-LA, 53 2145S-710-13.09- LBCH, 53 1422F-405-7.66-LBCH, 53 0747K-110-22.76-LA, 53 0838-710-21.28-BELL, 53 2506-005-7.83-DNY, 53 2707-405-6.98-LBCH. 6.98, 13.09, 22.76, 7.83 17.56, 23.19, 23.0 $11.91
Los Angeles 5 10 91 605 710 Drainage Repair/Upgrade pump stations 19.7 22.0 11.9 14.1 18.7 36.0 24.5 11.9 14.1 21.0 $8.47
Orange 5 Mobility Widen the off-ramp at the termini adding additional left turn lane @ NB I-5 off-ramp to Artesia Parkway 43.9 43.9 $1.64
Orange 39 Drainage Mitigate flooding by installing a new drainage system and repair damaged curb&gutter, On Beach Blvd. from Manchester Ave. to Craig Street 15.15 15.91 $4.13
Orange 91 Mobility Widen the off-ramp at the terminus - Within R/W, CE level Env. Doc. @ EB SR-91 off-ramp to Orangethorpe Avenue 0.31 0.31 $1.48
Orange Various Mobility Various Traffic Management Systems work, such as vehicle detection loops, cabinets, field wiring and replacement at a total of 101 locations. Various Various $2.60
TBD 5 Mobility Project proposes to efficiently manage traffic flow during planned and unplanned events in coordination with OCTA and the cities of Anaheim and Orange. I-5 Corridor N. Main Street and Beach Blvd to include only ITS elements. 33 43.2 $5.10
TBD 57 Mobility Project proposes to efficiently manage traffic flow during planned and unplanned events in coordination with OCTA and the cities of Anaheim and Orange. Route 57 between SR-22 and Orangethorpe Ave to include Intelligent Traffic System elements only. 10.7 16.6 $3.00
TBD 91 Mobility Project proposes to efficiently manage traffic flow during planned and unplanned events in coordination with OCTA and the cities of Anaheim and Orange. Route 91 between Beach Blvd and Kraemer/Glassell to include ITS elements only. R2.6 0.0 R4.1 7.2 $4.60