Senate District 8
Over half of all state and local roads are rated in poor condition, require safety improvements and fail to meet earthquake safety standards. The Road Repair and Accountability Act makes sure both state and local agencies have the resources they need to ensure our CA roads and bridges are up to safety standards.
See how this legislation will improve transportation and create tens of thousands of jobs in California with detailed information about annual allocations and projects slated to happen right here in our community.
Local Government Funding
Information on how much money our local governments will receive annually as part of new funding package.
Upcoming Projects
The State and regional transportation agencies will now be able to complete projects that were halted in 2016 due to inadequate funding.
Senate District 8: Additional projects slated to be funded Download the PDF | View Postmile Tool
County | Route | Category | Project Description | Begin Postmile | End Postmile | Estimated Cost ($M) |
---|---|---|---|---|---|---|
Sacramento | 50 | Bridge | RAIL UPGRADE | 0.38 | 13.94 | $9.20 |
Sacramento | 50 | Pavement | Install Exit Number signs, upgrading sign structures as needed | L0.0 | 23.1 | $2.00 |
Sacramento | 50 | Mobility | Construct auxiliary lane | R7.7 | R9.5 | $9.40 |
Sacramento | 99 | Bridge | RAIL UPGRADE | 1.57 | 23.69 | $5.30 |
Sacramento | 99 | Bridge | Widen bridges (BR#24-0028L, 0045L, 0027L, 0046L) | 4.8 | 6.6 | $2.60 |
Sacramento | 99 | Bridge | 4 bridges: Scour Mitigation Cosumnes River Overlow Br. No 24-0021R/L & 20R/L | 7.92 | 8.4 | $1.70 |
Sacramento | 99 | Pavement | Drainage Rehabilitation | 8.76 | 8.76 | $1.00 |
Sacramento | Various | Mobility | Upgrade existing Traffic Management System/AVC systems at various locations | Various | Various | $3.30 |
Fresno | 41 | Mobility | Auxiliary Lanes | R27.6 | R28.3 | $2.00 |
Fresno | 41 | Mobility | Add Auxiliary Lanes | R28.6 | R29.3 | $2.00 |
Fresno | 168 | Pavement | Pavement Preservation | 18.6 | T25.5 | $8.30 |
Fresno, Kern | VAR | Mobility | Install Changeable Message Signs | VAR | VAR | $3.50 |
Kern Fresno | 119 198 | Drainage | Replace, reline Culverts | 29 13.5 | 30.5 18.2 | $1.20 |
Kern Kings | 99 198 204 | Drainage | Replace Obsolete Pumps | Various | Various | $11.32 |
Madera Fresno Tulare | 99 | Drainage | Replace Obsolete Pumps | Various | Various | $11.30 |
Merced San Joaquin Stanislaus | 5, 99, 152 5, 12,99 5, 99 | Mobility | Replace & upgrade existing MDVs at various locations in D-10 | Various | various | $7.20 |
Stanislaus Merced | 99 59 | Drainage | Replace Drainage Pumps at various locations | 10.03 14.0 | 16.8 14.0 | $9.96 |
Stanislaus, Merced | 99, 152, 132, 219 | Mobility | Install traffic monitoring and detection systems | VAR | VAR | $2.44 |
Tulare Madera | 99 | Bridge | Upgrade Rail | 51.8, 28.2 | 51.8, 28.2 | $1.90 |
VAR | Various | Mobility | Vehicle Detection System Repair | Various | Various | $2.40 |
VAR | Various | Mobility | Vehicle Detection System Repair | Various | Various | $1.25 |
Various | Various | Mobility | Vehicle Detection System Repair | Various | Various | $6.56 |
Amador | 49 | Bridge | Replace the existing bridge rails with the current standard plan railing. | 0.01 | 0.01 | $4.90 |
Amador | 49 | Bridge | Replace /Upgrade Bridge Rail | 0.01 | 0.01 | $4.00 |
Amador | 88 | Pavement | Repair pavement | 5.5 | 14.3 | $7.20 |
Amador Calaveras Merced Mariposa San Joaquin Stanislaus Tuolumne | 26, 49, 88, 104 26 33, 59, 99, 152 49, 140 4, 5, 12, 99, 120, 205 132 49, 108, 120 | Mobility | Replace & upgrade existing MDVs at various locations in D-10 | Various | various | $3.30 |
Amador, Alpine | 88 | Mobility | Install Intelligent Traffic System elements for Carson Notification Systems for travellers to public recreations | 71.3, | 23.0, | $1.85 |
Calaveras | 4 | Mobility | Construct Two-Way Left Turn Lane | 29.24 | 29.38 | $1.44 |
Calaveras | 4 | Pavement | Slope Repair | 43.5 | 43.8 | $6.50 |
Calaveras | 4 | Mobility | Install ITS elements for Automated Warning Systems (AWS) for travelers to public recreations | R3.0 | R13.0 | $2.50 |
Calaveras | 41249 | Bridge | Bridge Rail Upgrade | 16.2 | 16.4 | $3.00 |
Calaveras | 4 26 | Bridge | Upgrade bridge rails of three bridges | Various | Various | $8.51 |
Inyo | 127 | Pavement | Shoshone Pavement Rehabilitation | 21 | 34.5 | $6.75 |
Inyo | 127 | Pavement | Death Valley Junction CAPM | 42.1 | 49.42 | $5.20 |
Inyo | 395 | Pavement | Cemetery Pavement Rehabilitation | 55.7 | 58.2 | $2.50 |
Inyo | 395 | Pavement | SB Fish Springs CAPM | 91.6 | 99 | $5.20 |
Inyo | 395 | Pavement | Bishop Pavement Rehabilitation | 114.98 | 117.8 | $6.00 |
Mariposa | 49 | Pavement | Pvmt Preservation | 0 | 18.5 | $14.40 |
Mariposa | 140 | Pavement | Pavement Preservation | 12 | 22 | $23.58 |
Mariposa | 140 | Pavement | Pavement Preservation | 25.3 | 51.8 | $29.09 |
Mariposa | 140 | Bridge | Replace/upgrade bridge rail | VAR | VAR | $2.38 |
Mono | 158 | Pavement | June lake Pavement Rehabilitation | 0 | 15 | $7.90 |
Mono | 395 | Pavement | Deadman Pavement Rehabiltation | 36.1 | 40.1 | $8.31 |
Mono | 395 | Pavement | Buckeye Pavement Rehabilitation | 77 | 80.5 | $5.43 |
Mono | 395 | Pavement | Walker Canyon Pavement Rehabilitation | 93 | 106.3 | $7.15 |
San Joaquin Stanislaus Tuolumne | 5 99 120 | Mobility | Upgrade & repair existing obsolete and broken Traffic Management System elements & improve communication | R13.9 4.56 R0.59 | R14.8 5.2 T6.8 | $2.50 |
Tuolumne | 49 | Mobility | Install traffic signal, extend left turn channelization and improve STAA truck turning radius. | 15.31 | 15.4 | $1.32 |
Tuolumne | 108 | Pavement | Pavement Preservation | R18.9 | 38.8 | $22.00 |
Tuolumne | 120 | Pavement | Culvert replacement or installation of Cured In Place Pipe (CIPP) liners | 3.39 | 39.8 | $2.10 |