Senate District 5
Cathleen Galgiani Stockton
Over half of all state and local roads are rated in poor condition, require safety improvements and fail to meet earthquake safety standards. The Road Repair and Accountability Act makes sure both state and local agencies have the resources they need to ensure our CA roads and bridges are up to safety standards.
See how this legislation will improve transportation and create tens of thousands of jobs in California with detailed information about annual allocations and projects slated to happen right here in our community.
Local Government Funding
Information on how much money our local governments will receive annually as part of new funding package.
Upcoming Projects
The State and regional transportation agencies will now be able to complete projects that were halted in 2016 due to inadequate funding.
Major Congestion Relief Funding Opportunities
Millions of additional dollars will be spent to create better solutions for congested corridors, trade corridors, self help counties.
Senate District 5: Additional projects slated to be funded Download the PDF | View Postmile Tool
County | Route | Category | Project Description | Begin Postmile | End Postmile | Estimated Cost ($M) |
---|---|---|---|---|---|---|
San Joaquin | 5 | Bridge | Bridge Rehab | 26.1 | 26.47 | $6.93 |
San Joaquin | 99 | Bridge | Bridge Rehabilitation | 7.4 | 8 | $17.00 |
San Joaquin | 99 | Bridge | Bridge Rehabilitation | 16.8 | 17.5 | $17.00 |
San Joaquin | 5 | Bridge | Bridge seismic retrofit | R12.9 | R12.99 | $38.50 |
San Joaquin | 4 | Mobility | Contingency Project: Install Ramp Meters | R16.0 | R19.4 | $56.51 |
San Joaquin | 120 | Mobility | Contingency Project: Install Ramp Meters | R 0.5 | T 6.8 | $3.30 |
San Joaquin, Alpine | 88 | Pavement | Culvert replacement or installation of Cured In Place Pipe (CIPP) liners | VAR | VAR | $3.24 |
San Joaquin | 26 | Bridge | Increase Bridge Vertical Clearance | 1.11 | 1.11 | $11.78 |
San Joaquin | 4,5,12,9 9 | Mobility | Install traffic monitoring and detection systems | VAR | VAR | $2.33 |
San Joaquin | 4 5 99 | Mobility | Installation of ramp meters, CMS's CCTV's, TMS's, and FO for connectivity on I-5 from Charter Way to Hammer Lane and on SR 4 from I-5 to S. Union St. ( Phase 2) | Various | Various | $12.96 |
San Joaquin | 99 | Pavement | Pavement preservation | 18.5 | 22.9 | $20.20 |
San Joaquin | 99 | Bridge | Pavement Preservation | 21.67 | 21.67 | $2.34 |
San Joaquin | 4 | Pavement | Pavement Rehab | R15.5 | R16.6 | $40.40 |
San Joaquin | 5 | Pavement | Pavement rehabilitation | 32.7 | 49.8 | $75.00 |
San Joaquin | 4 | Bridge | Reconstruct Hinge 32 | R16.6 | R16.6 | $5.30 |
San Joaquin | 5 | Pavement | Remove and Replace OH sign structure | VAR | VAR | $1.40 |
VAR | Various | Mobility | Repair and replace non-functional field elements and video detectors that are currently not in service or damaged. These detection systems under Tier 1 priority corridor, need immediate repairs and replacements. | Various | Various | $2.00 |
Merced San Joaquin Stanislaus | 5, 99, 152 5, 12,99 5, 99 | Mobility | Replace & upgrade existing MDVs at various locations in D-10 | Various | various | $7.20 |
Amador Calaveras Merced Mariposa San Joaquin Stanislaus Tuolumne | 26, 49, 88, 104 26 33, 59, 99, 152 49, 140 4, 5, 12, 99, 120, 205 132 49, 108, 120 | Mobility | Replace & upgrade existing MDVs at various locations in D-10 | Various | various | $3.30 |
San Joaquin | 12 | Bridge | Replace Bearing Pads | R4.4 | R4.4 | $2.50 |
San Joaquin | 12 | Bridge | Replace bridge bearing pads | R4.44 | R4.44 | $2.22 |
San Joaquin Alpine | 88 | Drainage | Replace drainage culverts that have exceeded their design life and deteriorated or failed | 13.5 0.28 | 14.1 2.56 | $3.24 |
San Joaquin | 4 12 99 120 | Drainage | Replace Drainage pumps | 21.65 17.28 21.65 0.42 | 33.6 17.28 33.60 0.42 | $1.88 |
San Joaquin Stanislaus Tuolumne | 5 99 120 | Mobility | Upgrade & repair existing obsolete and broken Traffic Management System elements & improve communication | R13.9 4.56 R0.59 | R14.8 5.2 T6.8 | $2.50 |
Sacramento | Various | Mobility | Upgrade existing Traffic Management System/AVC systems at various locations | Various | Various | $3.30 |